|
|
|
Step 1 Evaluation: Acquire original up-to-date floor plans of sports facility. Survey/inspect sport facility.
Determine sports facilities level of play. Design CAD specification drawings within regulations and code. Entity
to assemble committee to approve budget and flooring system usually 3-4 key persons: President, VP, facility
owner, marketing representatives or head coaches. |
| Step 2 Determine flooring system. Matching appropriate flooring system within entities budget.
Consider special environmental/ architectural needs. Educate entity on flooring systems options and their
advantages and disadvantages. Produce options and visual samples. |
| Step 3 Produce graphics mechanical. Determine color scheme and center court graphics to be
displayed. Acquirecamera ready graphic standards on entities logo & entity branding specifications. Consider
any special need that need to be address for facility activities. |
| Step 4 Set timelines. Produce schedule for work to be done and introduce superintendent. Establish
time frames for each production phase. Determine supply delivery schedule, and allocate a proper storage
areas on site for materials. |
| Step 5 Begin production: Surface preparation: leveling stripping, sub floor construction, floor
application, sanding, lacquer, curing, graphic applications. Proper maintenance and maintenance scheduling
to be produced and discussed with sports facility superintendent. |
|